...the wind got there first... With the roof only loosely held down, a strong thunderstorm blew through and knocked the roof section down. This roof section includes a short section of wall, and this wall section absorbed most of the damage, so we separated the roof from the upper walls and lowered the top portion, with its 4X4 frame, to the ground. The wheel frame was rebuilt on top of the lower wall section, the upper wall sections were repaired/ rebuilt, and then the roof was placed back on top. This was done on Saturday, 6/16. Also wall panels were added to the first building and underground electrical conduits were laid. On Sunday the track was installed. During the following week the roof hold-down hardware was finally added to the second building.